PlansPlan Room

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Anthony, Kansas WWTF Cell 5 Rip Rap Improvements 2019

Status: Accepting Bids
Bid Date:
Location:
Anthony, Kansas
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Wastewater Treatment Facility Rip Rap Improvements

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Hillsboro Water Service Improvements 2019

Status: Post Bid Review
Bid Date:
Location:
Hillsboro, Kansas
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Water Service Improvements

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

Ashland, Kansas CCLIP Surface Preservation Project of US-160 Highway

Status: Post Bid Review
Bid Date:
Location:
Ashland, Kansas
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Street/Highway Improvements Work consists of construction street improvements and includes milling, asphalt pavement patching, asphalt paving, sidewalk ramps, traffic control and pavement markings.

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

2019 Clifton K-9 Surface Preservation Project

Status: Post Bid Review
Bid Date:
Location:
Clifton, Kansas
EBH Contact:

Andrew Brunner 785-220-8234
AndrewB@EBHengineering.com

Short Description:

Street Improvements Major items of work include Approximately: 7220 square yards of Milling, 912 tons of HMA – Commercial Grade (Class A), 70 tons of HMA-Commercial Grade (Class A)(Patching), 188 square yards of Geogrid (Patching), 188 square yards of Granular Base (Patching), 2 each of Sidewalk Ramp, 40 square yards of Sidewalk Construction, 2345 linear feet of Pavement Marking (Multi-Component)(White)(6”), 3470 lineal feet of Pavement Marking (Multi-Component)(Yellow)(4”), 64 linear feet of Pavement Marking (Intersection Grade)(24”), 2 each of Manhole Adjustments, 2 each of Remove/Reset Mailbox, Traffic Control Items, Transportation of Salvageable Material and other appurtenances

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Haviland WWTF Fence Improvements 2019

Status: Post Bid Review
Bid Date:
Location:
Haviland, Kansas
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

WWTF Fence Improvements

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

2018 Hillsboro Street Imp.- West Grand Mill and Overlay, Washington, Lincoln and Jefferson Reconstruction

Status: Ongoing
Bid Date:
Location:
Hillsboro, Kansas
EBH Contact:

Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com

Short Description:

Street Improvements

  • Posted:
  • type: Land Development
image description
  • Posted:
  • type: Land Development

Lakin Drainage Improvements 2019

Status: Post Bid Review
Bid Date:
Location:
Lakin, Kansas
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.coim

Short Description:

Drainage Improvements Major items of work include approximately: 85 C.Y Common Excavation, 270 L.F. Concrete Slope Protection, 1 Each Concrete Flume, 1 Each Inlet, 1 Each Reinforced Concrete Manhole, 370 L.F. Storm Sewer Pipe (l9"x30") (RCPHE), 374 L.F. Storm Sewer Pipe (24") (RCP), 1 Each End Section and various other appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Holton, Kansas Water Treatment Plant Improvements 2018

Status: Inprogress
Bid Date:
Location:
1010 New Jersey, Holton, KS
EBH Contact:

Engineer: Don Hellar, P.E.
620-672-1112
DonH@EBHengineering.com

Short Description:

Water Treatment Plant Improvements Major items of work include: Rework existing Water Treatment Plant including: Remove and replace existing SCADA system; remove and replace control valves, backwash pump with VFD, filter consoles, building windows, turbidity meters; paint basement and piping; and partially upgrade plant electrical. Plant is located at 1010 New Jersey, Holton, Kansas. Backwash pump will be furnished by the City. Davin Electric will perform electric work. ALELCO will provide SCADA system. A mandatory walk through will be held at the plant on Tuesday, March 5, 2019 at 1:30 P.M.

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

2018 Hillsboro Street Improvements – East Grand Street

Status: Inprogress
Bid Date:
Location:
Hillsboro, KS
EBH Contact:

Darin Neufeld, P.E. 620-947-3700
DarinN@EBHengineering.com

Short Description:

Street Improvements Base Bid: East Grand from Washington St to Adams St – Concrete Surface
Add/Alt 1: East Grand from Washington St to Adams St – Concrete Paver Surface
Add/Alt 2: Offstreet Parking between Washington St and Jefferson St
Add/Alt 3: Offstreet Parking between Jefferson St and Madison St

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

2018 Hillsboro Street Improvements – Waterline Streets

Status: Inprogress
Bid Date:
Location:
Hillsboro, Kansas
EBH Contact:

Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com

Short Description:

Street Improvements Base Bid: 1st Street from Adams St to alley east of Wilson St & Wilson Street from 1st St to C St.
Add/Alt 1: C Street from Adams St to Kennedy St.
Add/Alt 2: Kennedy Street from A St to C St
Add/Alt 3: Intersection of Ash Street & D Street