PlansPlan Room

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Victoria, KS Water System Improvements 201-Part 2-Water Tower

Status: Accepting Bids
Bid Date:
Location:
Victoria, KS
EBH Contact:

Michael Younger, P.E. 620-672-1112

MikeY@EBHengineering.com

Short Description:

Water System Improvements Designing and constructing a new 150,000 gallon welded steel elevated water tower, single pedestal spheroidal type, including foundation; furnishing and installing 26 L.F. of 12" ductile iron water line, including valves & fittings, to connect new tank into distribution system; 256 L.F. fencing and gates; telemetry work (telemetry contractor is Don’s Electric and Rewind, Ellis, Kansas); electrical work; natural gas generator and ATS; site work; and appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Victoria, KS Water System Improvements 2019-Part 1-Water Line

Status: Accepting Bids
Bid Date:
Location:
Victoria, KS
EBH Contact:

Michael Younger, P.E. 620-672-1112

MikeY@EBHengineering.com

Short Description:

Water System Improvements Water transmission and distribution system improvements including: 9,880 l.f. of 4”, 4,080 l.f. of 6”, 460 l.f. of 8”, and 2,100 l.f. of 12” AWWA C900 PVC water line; 1,455 l.f. directional boring; 70 l.f. bore and jack railroad crossing; 46 gate valves; 4 fire hydrants; 51 service tie-ins/connections; 2 master meter vaults; pump station improvements; paving; seeding; traffic control; erosion control; and appurtenances. Option 1 includes installing 1,745 l.f. of 8” AWWA C900 PVC in place of 6”, including valves, fittings, boring, and appurtenances.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Holton, KS 2020 Collection System Rehabilitation: CIPP

Status: Post Bid Review
Bid Date:
Location:
Holton, KS
Addendum:
No. 1 Dated 3-16-2020
EBH Contact:

Andrew Brunner 785-899-7019
AndrewB@EBHengineering.com

Short Description:

Sewer Collection System Rehabilitation: CIPP Rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (CIPP), sewage pump around as required, approximately 8,082 L.F. of 8” CIPP, traffic control, and appurtenances. Additive Areas: Rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects , prepping line to receive cured in place pipe (CIPP), sewage pump around as required, approximately 1,466 L.F. of 8” CIPP, approximately 354 L.F. of 12” CIPP, traffic control, and appurtenances.

  • Posted:
  • type: Community Enhancement
image description
  • Posted:
  • type: Community Enhancement

Marion KS Clear Creek Streambank Stabilization

Status: Post Bid Review
Bid Date:
Location:
Marion, KS
Addendum:
No. 1 Dated 3-13-2020
EBH Contact:

Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com

Short Description:

Streambank Stabilization Major items of work include: Mobilization & Demobilization, 300 cubic yards of Excavation (Excavation),
Earthfill (Subsidiary to Excavation), 126 tons of Rock RipRap (Rock Rip Rap), 300 tons of Rockfill (subsidiary
to Rock Rip Rap), 47 tons of Drainfill (Subsidiary to ), 123 tons of Ditch Lining Rock (Rock Rip Rap), 310
square yards of Geotextile (Subsidiary to Rock Rip Rap), Pollution Control (Subsidiary to Mobilization and
Demobilization), and other items subsidiary to these bid items, along with other appurtenances.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Holyrood, KS STF Improvements 2019

Status: Post Bid Review
Bid Date:
Location:
Holyrood, KS
Addendum:
No 1. Dated 2-10-2020
EBH Contact:

Richard Ammel, P.E. - 620-793-8411 RichardA@EBHengineering.com

Short Description:

Sewer Treatment Facilities Improvements Construction of a wetlands cell, construction staking, construction of a treated effluent pump station and 4” PVC force main, boring under abandoned railroad, construction of access road, fencing, implementing pollution prevention plan, filling wetlands cell, installation of floating aerators in existing cells, and seeding, as required.

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

2019 Marion K-256 Surface Preservation

Status: Post Bid Review
Bid Date:
Location:
Marion, Kansas
EBH Contact:

Darin Neufeld, P.E. 620-381-2122
DarinN@EBHengineering.com

Short Description:

Transportation Major items of work include: 13,500 square yards of Milling, 1,650 tons of HMA – Commercial Grade (Class A),123 cubic yards of Common Excavation, 33 cubic yards of Compaction of Earthwork (Type B)(MR-90), 40 tons of HMA – Commercial Grade (Class A)(Patching), 125 square yards of Aggregate Base (AB-1)(4”), 125 square yards of Geosynthetic Reinforcement (For Base), 1,115 square yards of Aggregate Shoulder (AS-1)(4”), 3,245 lineal feet of Pavement Marking (Multi-Component)(White)(6”), 5,392 lineal feet of Pavement Marking (Multi-Component)(Yellow)(4”), 24 lineal feet of Pavement Marking (Multi-Component)(White)(12”), 2 each of Pavement Marking Symbol (Intersection Grade)(White)(Railroad Xing), Traffic Control Items, and other appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

LaCrosse Water Valve Replacement 2019

Status: Post Bid Review
Bid Date:
Location:
LaCrosse, Kansas
EBH Contact:

Alan Luttrell, P.E. 620-672-1112
AlanL@EBHengineering.com

Short Description:

Water System Improvements Major items of work include: Replace 15 water valves within the city of LaCrosse, Kansas. Restore excavations by replacing paving and/or concrete with concrete only.

  • Posted:
  • type: Community Enhancement
image description
  • Posted:
  • type: Community Enhancement

Goodland Topside Trail 2019

Status: Post Bid Reveiw
Bid Date:
Location:
Goodland, Kansas
EBH Contact:

Andrew Brunner 785-899-7019
AndrewB@EBHengineering.com

Short Description:

Recreational Trail The City of Goodland will receive sealed bids for the Goodland Topside Trail 2019, at City Hall in Goodland, 204 W 11th St., P.O. Box 59, Goodland, Kansas 67735 until 11:00 am MT, Tuesday, November 12, 2019. Bids received after this time will not be accepted. Bids will be publicly opened and read aloud immediately after the specified closing time.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Pratt Airport Water Line Improvements 2019 – Contractor Installed Phase

Status: Post Bid Review
Bid Date:
Location:
Pratt, Kansas
Addendum:
No. 2, dated 10/11/2019
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Water System Improvements The City of Pratt, Kansas will receive sealed bids for the construction of Airport Water Line Improvements 2019-Contractor Installed Phase at the City Hall, 619 S. Main St. – PO Box 807, Pratt, KS 67124, until Tuesday, October 15, 2019 at 1:30 P.M.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Anthony, Kansas WWTF Cell 5 Rip Rap Improvements 2019

Status: Inprogress
Bid Date:
Location:
Anthony, Kansas
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Wastewater Treatment Facility Rip Rap Improvements