Holton Sewer Line Improvements 2021

Status: Accepting Bids
Bid Date:
Location:
Holton, Kansas
EBH Contact:

Andrew Brunner, P.E. 785-899-7019
AndrewB@EBHengineering.com

Short Description:

Holton Sewer Line Improvements 2021 Rehabilitation of the sanitary sewer collection system including constructing 2 new manholes, approximately 70’ of various depth point repairs, manhole invert repairs, repair of asphalt, gravel and brick surfacing, traffic control, and appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Cimarron Waterline East HWY 50 Improvements 2021

Status: Post Bid Review
Bid Date:
Location:
Cimarron, Kansas
Addendum:
No. 1 - Dated 09-29-2021
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Cimarron Waterline East HWY 50 Improvements 2021 The major items of work include water line improvements:, 8 linear feet 6” C900 DR18 PVC Pipe, 3511 linear feet 8” C900 DR18 PVC Pipe, 425 linear feet 8” C900 DR18 Certa-Lok Pipe, 425 linear feet 8” Bore & Encase w/16” Steel Casing, 2 each 6” Gate Valve w/Valve Box, 2 each 8” Gate Valve w/Valve Box, 2 each Waterline Connection, 2 each Fire Hydrant Assembly (3-way), 62 linear feet 1” Service Line w/Tracer Wire, 2 each 1” Service Tie In (incl. Saddle, Corp Stop & Fittings), 4 each Monitoring Station for Tracer Wire, 2 each Waterline Abandonment, 88 square yards Remove & Replace Gravel Surfacing, 30 square yards Remove Pavement & Replace w/Concrete, and other appurtenances.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Lyons ATP Utility Improvements 2021

Status: Post Bid Review
Bid Date:
Location:
Lyons, Kansas
Addendum:
No. 1 - Dated 08-20-2021
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Lyons ATP Utility Improvements 2021 Major items of work include: Contractor Installed Phase: Installing approximately 697 l.f. of 8” SDR 26 PVC sewer main; including manholes, and appurtenances. Work also includes Courthouse Sanitary Sewer Improvements as shown on Attachment 1 of the Drawings. City Installed Phase: The owner will be installing approximately 930 l.f. of additional 8” C900 PVC waterline concurrently; including hydrants, valves, connections, service connection, right-of-way restoration, and appurtenances.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Plains Wastewater Treatment Facility Improvements 2021

Status: Post Bid Review
Bid Date:
Location:
Plains, Kansas
EBH Contact:

Andrew Brunner, P.E. 785-899-7019
AndrewB@EBHengineering.com

Short Description:

Plains Wastewater Treatment Facility Improvements 2021 Major items of work – Reconstruction of Cell #2 slopes to include, removing and resetting the existing liner on the slopes, regrade and compact embankment with bentonite, 172 tons of bentonite treatment, 1,063 square yards of 4” concrete pavement, seeding and appurtenances as required. Existing sewer facilities shall be kept in operation at all times.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Spearville Waterline Improvements 2021

Status: Post Bid Review
Bid Date:
Location:
Spearville, Kansas
Addendum:
NO. 1 - DATED 07-26-2021
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Spearville Waterline Improvements 2021 The major items of work include water line improvements: 20 linear feet 4” DR18 C900 Pipe, 7535 linear feet 6” DR18 C900 Certa-Lok Pipe, 5 linear feet 4” Bore (Pipe not incl.), 7358 linear feet 6” Bore (Pipe not incl.), 1 each 2” Gate Valve w/Valve Box, 2 each 4” Gate Valve w/Valve Box, 48 each 6” Gate Valve w/Valve Box, 13 each Waterline Connection, 9 each Fire Hydrant Assembly (3-way), 2426 linear feet 1” Service Line w/Tracer Wire, 1663 linear feet 1” Bore, 60 each 1” Service Connection (incl. Saddle, Corp Stop & Fittings), 386 linear feet 2” Service Line w/Tracer Wire, 288 linear feet 2” Bore, 8 each 2” Service Connection (incl. Saddle, Corp Stop & Fittings), 9 each Monitoring Station for Tracer Wire, 11 each Waterline Abandonment, 27 each Valve and Valve Box Abandonment, 9 each Fire Hydrant Removal, 4 each Water Meter Abandonment, 95 square yard Remove & Replace Brick Surfacing, 50 square yard Remove & Replace Concrete Sidewalk, 495 square yard Remove Pavement & Replace w/Concrete, and other appurtenances.

  • Posted:
  • type: Community Enhancement
image description
  • Posted:
  • type: Community Enhancement

Annie Oakley Park Improvements 2021

Status: Post Bid Review
Bid Date:
Location:
Oakley, Kansas
Addendum:
No. 1 - Dated 08-04-2021
EBH Contact:

Andrew Brunner, P.E. 785-899-7019
AndrewB@EBHengineering.com

Short Description:

Annie Oakley Park Improvements 2021 Major items of work include: 153 cubic yards of unclassified excavation, 30 lineal feet of curb and gutter combined, 1,888 square yards of 4” sidewalk construction, 112 square yards of 6” sidewalk construction, 3 each pedestal water bottle filling stations, 1 each playground shade installation, 1 picnic area shade installation, seeding and appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

LaCrosse Waterline Improvements 2021

Status: Post Bid Review
Bid Date:
Location:
LaCrosse, Kansas
Addendum:
ADDENDA NOS. 1 & 2
EBH Contact:

Joel Krosscell, PE 620-855-7030
JoelK@EBHengineering.com

Short Description:

LaCrosse Waterline Improvements 2021 The major items of work include water line improvements: 5 each Waterline Connection, 923 linear feet 6” C900 DR18 PVC Pipe, 282 linear feet 6” Bore & Encase w/12” Steel Casing, 682 Linear Feet 6” Bore (Pipe not included), 740 linear feet 6” C900 DR18 Certa-Lok Pipe, 14 each 6” Gate Valve w/Valve Box, 1 each 8” Gate Valve w/Valve Box, 5 each Waterline Abandonment, 6 each Valve and Valve Box Abandonment, 3 each Abandon Fire Hydrant & Feeder Line, 3 each Fire Hydrant Assembly (3-way), 3 each Test Station Tracer Wire, 18 Each Water Meter Abandonment, 656 linear feet 1” Service Line w/Tracer Wire, 344 linear feet 1” Bore, 17 each 1” Service Connection (incl. Saddle, Corp Stop & Fittings), 271 linear feet 2” Service Line w/Tracer Wire, 246 linear feet 2” Bore, 1 each 2” Service Connection (Incl. Saddle, Corp Stop & Fittings), 2 each Sanitary Sewer Crossing, 40 square yard Remove & Replace Gravel Surfacing, 130 square yard Remove Pavement & Replace w/Concrete, 43 square yard Remove & Replace Concrete Sidewalk, and other appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Victoria Water System Improvements 2019-Part 3-Water Wells

Status: Awarded
Bid Date:
Location:
Victoria, KS
Addendum:
No. 1 - Dated 07-09-2021
EBH Contact:

Michael Younger, P.E. 620-672-1112

MikeY@EBHengineering.com

Short Description:

Water System Improvements 2019 Part 3 - Water Wells Constructing two (2) new KDHE approved public water supply wells to offset and replace existing City Wells 13 and 14, including 24-inch diameter bore hole, 12-inch casing and screen, approximately 52 to 65 feet in depth; pitless units; well pads; meter vaults; connection piping; electrical work; telemetry work (telemetry contractor is Don’s Electric and Rewind, Ellis, KS); test holes; and plugging and abandonment of existing production wells. Project geologist services provided by Owner.

  • Posted:
  • type: Airport
image description
  • Posted:
  • type: Airport

Marion 2.4kV to 12.47kV/7.2kV Conversion 2021

Status: Awarded
Bid Date:
Location:
Marion, Kansas
EBH Contact:

Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com

Short Description:

Marion 2.4kV to 12.47kV/7.2kV Conversion 2021 Work consists of
1. Convert the system voltages from 2.4kV L-G to 12.47kV/7.2kV on the Circuit-Hospital, Circuit-Waterplant, Circuit 3, and Circuit-5 feeds;
2. Replace undersized and legacy conductor on the new main feeds to meet or exceed the downline specifications;
and
3. Retire unleaded feeds from decommissioned lines.

  • Posted:
  • type: Airport
image description
  • Posted:
  • type: Airport

Anthony Municipal Airport Demolition & Site Clearing Runway 36 RPZ

Status: Awarded
Bid Date:
Location:
Anthony, Kansas
Addendum:
ADDENDUMS NO. 1 & 2
EBH Contact:

Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com

Short Description:

Anthony Municipal Airport Demolition and Site Clearing Runway 36 RPZ This project will demolish 10 structures and approximately 30 trees near the Anthony Municipal Airport. Demolition shall include removing foundations. Restoration shall including grading and seeding of disturbed areas.

  • Posted:
  • type: Airport
image description
  • Posted:
  • type: Airport

Goodland Municipal Airport Reconstruct Runway 5-23

Status: Awarded
Bid Date:
Location:
Goodland, Kansas
EBH Contact:

Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com

Short Description:

Goodland Municipal Airport Reconstruct Runway 5-23 Project will reconstruct and add a 500 foot extension to Runway 5-23 at the Goodland Municipal Airport. Project will include 6” Concrete Pavement over Full Depth Reclamation Base, replacement all lights on this runway with LED lighting, pavement marking, seeding and PAPI relocation.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Lift Station Replacement 2021 Kristi Lane, Holcomb, KS

Status: Awarded
Bid Date:
Location:
Holcomb, Kansas
Addendum:
ADDENDUMS NO. 1 & 2
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Lift Station Improvements Installation of a sewage lift station, generator set, 34 S.Y. 6” Concrete Pavement and appurtenances as required. Existing sewer facilities shall be kept in operation at all times.