Holton Collection System Rehabilitation: CIPP 2022
Andrew Brunner, PE 785-220-8234
AndrewB@EBHengineering.com
Holton Collection System Rehabilitation: CIPP 2022 Rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (CIPP), sewage pump around as required, approximately 148 L.F. of 6” CIPP, 9,037 L.F. of 8” CIPP, 1,799 L.F. of 10” CIPP, 779 L.F. of 12” CIPP, 2 internal drop installations, traffic control, and appurtenances. Additive Areas: Rehabilitant of sanitary sewer collection system including cleaning, videotaping and logging defects, prepping line to receive cured in place pipe (CIPP), sewage pump around as required, approximately 1,579 L.F. of 8” CIPP, traffic control, and appurtenances.
Inman West and Nikkel Additions Utility Extensions 2022
Darin Neufeld, P.E. 785-821-1040
DarinN@EBHengineering.com
Inman West and Nikkel Additions Utility Extensions 2022 Major items of work include:
Base Bid 1: 700 LF of 6” C900 DR18 PVC Pipe, 180 LF of Boring with 12” CertaLok Encasement Pipe, 5 – 6” Gate Valve with Valve Boxes, 1 – 3 Way Fire Hydrants, 850 LF of 8” SDR 26 PVC Sewer Main, and 3 – Standard Manholes
Base Bid 2: 1200 LF of 6” C900 DR18 PVC Pipe, 200 LF of 4” C900 DR18 PVC Pipe, 100 LF of 2” HDPE Service Line, 100 LF of Boring with 12” CertaLok Encasement Pipe, 8 – 6” Gate Valve with Valve Boxes, 2 – 3 Way Fire Hydrants, 900 LF of 8” SDR 26 PVC Sewer Main, and 3 – Standard Manholes
Add/Alt 1: 540 LF of 6” C900 DR18 PVC Pipe, 100 LF of Jack & Bore 12” Steel Encasement Pipe, and 3 – 6” Gate Valve with Valve Boxes
Add/Alt 2: 900 LF of 6” C900 DR18 PVC Pipe, 2 – 6” Gate Valve with Valve Boxes and 2 – 3 Way Fire Hydrants
Add/Alt 3: 500 LF of 8” SDR 26 PVC Sewer Main, and 2 – Standard Manholes
Cimarron K23 Highway Improvements 2021
Joel Krosschell, PE 620-855-7030
JoelK@EBHengineering.com
Cimarron K23 Highway Improvements 2021 The major items of work include highway improvements: 1 Lump Sum of Mobilization, 9387 Square Yards of Milling, 1200 Tons of HMA-Commercial Grade (Class A), 371 Tons of HMA-Commercial Grade (Class A) (Patching), 1052 Square Yards of Granular Base (Patching), 1052 Square Yards of Geosynthetic Reinforcement (Patching), 391 Cubic Yards of Transporting Salvageable Material, 3654 Lineal Feet of Pavement Marking (Multi-Component) (Yellow) (4”), 809 Lineal Feet of Pavement Marking (Multi-Component) (White) (6”), 1 Lump Sum of Traffic Control, 1 Lump Sum of Contractor Construction Staking, 1 Hourly of Flagger (Set Price), and other appurtenances.
Elkhart Water System Improvements 2021-Part 2-Telemetry Monitoring and Control System
Andrew Brunner, P.E. 785-899-7019
AndrewB@EBHengineering.com
Elkhart Water System Improvements - Part 2 - Telemetry Monitoring and Control System This project will consist of the installation of a new SCADA system to replace the existing control system for the entire water and wastewater system. The new system will include components located at water wells 8, 10 and 11, elevated water tower, standpipe water tower, booster pump station, sewer lift station, ground storage tank, wastewater plant and city hall. The controls hardware shall include expansion capacity to allow additional system components to be added at a later date.
Elkhart Water System Improvements 2021-Part 1-Water Service Improvements
Andrew Brunner, P.E. 785-899-7019
AndrewB@EBHengineering.com
Elkhart Water System Improvements 2021 - Part 1 - Water Service Improvements This project will consist of removing existing meters and installing new meters on approximately 75% of the town. It is estimated that approximately 992 services will be involved. The existing mechanical meters will be replaced with Badger meters and pit transceivers. It is estimated that approximately 651 - 5/8” meters will need to be removed and replaced, 83 - 1” meters will need to be removed and replaced, 12 - 1.5” meters will need to be removed and replaced, 29 - 2” meters will need to be removed and replaced, 1 – 3” meter will need to be removed and replaced, purchase of 3 – 8” mag meters to be installed by the city, and 995 cellular endpoints with new meter boxes at all services in town.