  • type: Land Development

Goodland Street Improvements 2021

Status: Accepting Bids
Bid Date:
Location:
Goodland, KS
Addendum:
No. 1 Dated 4-16-2021
EBH Contact:

Andrew Brunner, P.E. 785-899-7019

AndrewB@EBHengineering.com

Short Description:

Street Improvements 2021 3,880 cubic yards of unclassified excavation, 7,560 square yards of 8” aggregate base and geosynthetic reinforcement, 2,000 lineal feet of curb and gutter combined, 6,745 square yards of 8” concrete pavement, 65 square yards of 8” concrete valley gutter, 20 square yards of 6” concrete pavement, 10 each water valve box adjustment, 1 each manhole adjustments, traffic control, erosion control and appurtenances.

  • Posted:
  • type: Transportation
image description
  • Posted:
  • type: Transportation

Spearville Drainage Improvements 2020

Status: Post Bid Review
Bid Date:
Location:
Spearville, KS
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Spearville Drainage Improvements 2020 Major items of work include approximately: 594 C.Y Common Excavation, 31 C.Y. Rock Excavation, 309 S.Y. 4’ Concrete Ditch Lining, 194 S.Y. 10’ Concrete Ditch Lining, 327 S.Y. Concrete Inverted Alley Gutter, 76 L.F. Curb & Gutter, Combined (AE), 182 S.Y. Concrete Pavement (6”)(Reinforced)(AE), 46 L.F. Storm Sewer Pipe (18”) (RCP), 2 Each End Section (18”)(RC), 30 L.F. Storm Sewer Pipe (24”)(CMP), 1 Each Concrete Flume, 7 S.Y. Rip Rap Slope Protection, 653 S.Y. Remove & Replace Gravel Surfacing, 4 Each Adjustment of Manhole, 0.50 Acre of Seeding, and various other appurtenances.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Minneola Water System Improvements 2020

Status: Post Bid Review
Bid Date:
Location:
Minneola, KS
Addendum:
NO. 1 DATED 2-9-2021
EBH Contact:

Alan Luttrell, PE 620-672-1112
AlanL@EBHengineering.com

Short Description:

Minneola Water System Improvements 2020 The major items of work include water line improvements: the replacement of cast iron lines and glue-joint PVC with approximately 90 linear feet of 4”, 2,910 liner feet of 6”, and 13,070 linear feet of 8” bell joint PVC pipe; six bored and encased highway crossings and one bored and encased railroad crossing; installation of 19 new fire hydrants, 110 valves, and 130 service connections using existing water meters; replacement of the pump, motor and appurtenances in one well; electrical and general improvements to three well houses and power at existing water tower; removing and replacing paving, sidewalk, curb, and gutter damaged by water line installation; installation of a SCADA system; remove and replace surfacing; and other appurtenances.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Liebenthal STF Improvements 2020

Status: Post Bid Review
Bid Date:
Location:
Liebenthal, KS
Addendum:
ADDENDUMS NO. 1, 2 & 3.
EBH Contact:

Richard Ammel, PE (620) 792-8411
RichardA@EBHengineering.com

Short Description:

Liebenthal STF Improvements 2020 The major items of work include replacing the existing wet well mounted lift station with a new lift station, installing a generator with propane tank and electrical work at the lift station, pumping existing sewer flow to maintain sewer service during pump station replacement, pump wastewater from Cell 1 to Cell 2 for doing work in Cell 1 at the wastewater treatment facility, renovate existing dike and install 1730 square yards of 12” thick riprap on the inside dikes of Cell 1 at the existing wastewater treatment facility, install new division box or replace valves in existing division box and clean lines of existing control structure at wastewater treatment facility and other related items to upgrade the existing wastewater treatment facility.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Lift Station Replacement 2021 Kristi Lane, Holcomb, KS

Status: Post Bid Review
Bid Date:
Location:
Holcomb, Kansas
Addendum:
ADDENDUMS NO. 1 & 2
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Lift Station Improvements Installation of a sewage lift station, generator set, 34 S.Y. 6” Concrete Pavement and appurtenances as required. Existing sewer facilities shall be kept in operation at all times.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Ashland Water System Improvements 2020-Part 2-Water Well

Status: Post Bid Review
Bid Date:
Location:
Ashland, KS
Addendum:
NO. 1 - DATED 01-21-2021
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Ashland Water System Improvement - Part 2 - Water Well Constructing a new KDHE approved public water supply well with 30-inch diameter bore hole, 12-inch casing and screen, approximately 80 feet in depth; construct new CMU well building including electrical work, chlorination equipment and piping; install test hole; provide final well design by licensed geologist, and plug and abandon existing test well and production well.

  • Posted:
  • type: Water
image description
  • Posted:
  • type: Water

Ashland Water System Improvements 2020-Part 1-Water Lines

Status: Post Bid Review
Bid Date:
Location:
Ashland, KS
Addendum:
ADDENDUMS NO. 1 & 2
EBH Contact:

Michael Younger, P.E. 620-672-1112
MikeY@EBHengineering.com

Short Description:

Ashland Water System Improvement - Part 1 - Water Lines Water distribution system improvements including: 40 l.f. of 4”, 2,000 l.f. of 6”, and 1,000 l.f. of 8” AWWA C900 PVC water line; 2,200 l.f. directional boring; 28 gate valves; 5 fire hydrants; 38 service tie-ins/connections; paving; seeding; traffic control; project sign; and appurtenances.

  • Posted:
  • type: Wastewater
image description
  • Posted:
  • type: Wastewater

Cimarron WWTF Improvements 2020

Status: Post Bid Review
Bid Date:
Location:
Cimarron, KS
EBH Contact:

Joel Krosschell, P.E. 620-855-7030
JoelK@EBHengineering.com

Short Description:

Cimarron WWTF Improvements Major items of work include Approximately: Construction of a wetlands cell, construction staking, construction of a sewage pump station improvements and 10” PVC force main, fencing, implementing pollution prevention plan, filling wetlands cell, installation new piping in existing cells, sludge removal from existing cells 1 and 2, fencing, seeding and appurtenances as required. Existing sewer facilities shall be kept in operation at all times.

  • Posted:
  • type: Land Development
image description
  • Posted:
  • type: Land Development

Colby Community College 2020 Farm Drainage Improvements

Status: Awarded
Bid Date:
Location:
Colby, KS
EBH Contact:

Project Manager Andrew Brunner
785-220-8234
AndrewB@EBHengineering.com

Short Description:

Drainage Improvements Colby Community College (CCC) is currently seeking competitive sealed bids for the College Farm Drainage Improvements. Please find the attached Bidding Documents and Plan Set showing the proposed improvements.

Overview: Major items of work include: 4207 cubic yards of common excavation, 4848 cubic yards of compaction of earthwork, 130 lineal feet of pipe culvert (12”)(CSP), 256 lineal feet of pipe culvert (18”)(CSP), 5049 square yards of gravel surfacing (1 ½”), erosion control, seeding and other apprentices.