Projectsimage descriptionMinneola Water System Improvements 2020

Status: Completed
Owner: City of Minneola
Location
Minneola, KS

image description

The City of Minneola worked closely with EBH Engineering on updating their water system. This included preliminary engineering design which resulted in new waterlines, fire hydrants, and water valves. EBH also designed a new SCADA system to better operate City wells, pump and storage facilities.



If you want to learn more about how we can help your community with your engineering projects, contact us today!

Contact Us Today!

ProjectsProject Information

Services Provided
  • Preliminary Engineering Reports
  • Waterline Improvements
Project Details

The major items of work include water line improvements: the replacement of cast iron lines and glue-joint PVC with approximately 90 linear feet of 4”, 2,910 liner feet of 6”, and 13,070 linear feet of 8” bell joint PVC pipe; six bored and encased highway crossings and one bored and encased railroad crossing; installation of 19 new fire hydrants, 110 valves, and 130 service connections using existing water meters; replacement of the pump, motor and appurtenances in one well; electrical and general improvements to three well houses and power at existing water tower; removing and replacing paving, sidewalk, curb, and gutter damaged by water line installation; installation of a SCADA system; remove and replace surfacing; and other appurtenances.