Projectsimage descriptionStockton, KS Water System Improvements 2018

Status: Completed
Owner: City of Stockton, Kansas
Location
Stockton, Kansas

image description

The City of Stockton, Kansas will receive sealed bids for the construction of Water System Improvements 2018 at the City Hall, 115 S. Walnut – PO Box 512, Stockton, KS 67669 , until 2:00 P.M. (CT), Thursday, September 6, 2018 . Bids received after this time will not be accepted.  Bids will be publicly opened and read aloud immediately after the specified closing time.

Major items of work include Erection of factory-built pump station, including variable speed packaged pumping system to maintain constant water delivery pressure; connection of main power source; construction of concrete foundation, earthwork, and abandonment of existing booster pump station. Includes piping to connect new booster pump station to water supply line, with all necessary piping, valves, fittings and other necessary appurtenances as shown on the Drawings and in these Specifications. These specifications are based on the certain products deemed most suitable for the application involved. The modular building and packaged pumping system shall be as manufactured by Precision Systems of Calumet City, IL as supplied by Ray Lindsey Company of Belton, MO., or approved equal.

Installation of approximately 2800 linear feet of 6” waterline with fire hydrants, valves, and appurtenances.

Alternative manufacturers for the pump station will be considered only if one or more bidding contractor(s) pre-submit all materials required to review the alternative design, two (2) weeks prior to bid date.



ProjectsProject Information

Services Provided
  • Waterline Improvements
Project Details