• type: Transportation

Projectsimage descriptionPeabody KDOT Cost Share 4th Street Improvements 2023

Status: Post-Bid Review
Owner: City of Peabody, Kansas
Location
Peabody, Kansas

The City of Peabody will receive sealed bids for the 2023 Peabody KDOT Cost Share 4th Street Improvements either in person at the Office of the City Clerk or to the online plan room of EBH Engineering (https://ebhengineering.com/plan-room/) until 3:00 P.M. Monday, January 29, 2024. Bids received after this time will not be accepted. Bids will be opened and read aloud immediately after the specified closing time.

STREET IMPROVEMENTS: (Major Items of Work)
4th Street from Peabody St to Locust St
3500 square yards of 6” Concrete Pavement; 130 square yards of 6” Concrete Entrance Pavement; 950 linear feet of Curb & Gutter; 2000 cubic yards of Excavation; 4300 square yards of 4”Crushed Rock Base over Geo; 310 square yards of 8” Concrete Valley Gutter; 90 square yards of 4” Sidewalk with Ramps; Seeding and Traffic Control

Bidding Documents may be examined at City of Peabody and at the Engineer’s office. They are available for download at the online plan room of EBH Engineering (https://ebhengineering.com/plan-room/)

The project will be reviewed for compliance with the Bid Documents, and the OWNER reserves the right to award the contract to the lowest responsible, responsive bidder.

OWNER reserves the right to waive irregularities and to reject any and/or all bids.



Plan RoomProject Information

Services Provided
  • Project Funding and Grant Application
  • Road and Bridge Design
  • Street and Highway Improvements
  • State and Federal Permits
  • Surveying
  • Traffic Engineering
Project Details

The project included:

  • 230 square yards of 8” Concrete Valley Gutter
  • 4000 square yards of 6” Concrete Pavement
  • 2,450 square yards of 6” Concrete Entrance Pavement
  • 2,900 linear feet of Curb and Gutter
  • 1,925 cubic yards of Common Excavation
  • 8,123 square yards of 4”Crushed Rock Base over Geogrid
  • 285 square yards of 4” Sidewalk
  • Seeding and Traffic Control
Grant Programs Used
  • KDOT Cost Share Program
Project Team
  • image description
    Darin Neufeld, PE